1. In 2016, complete the transformation of equipment and process to achieve production capacity;
2. From 2017 to 2018, technological transformation and product diversification and high-quality production; The annual output of 100000 tons of sodium sulfite production system, 20000 tons of sodium pyrosulfite production system and 80000 tons of desulfurization wastewater treatment system have been built;